I have set up Neoload controller to run a nightly set of tests as part of our continuous integration tasks. However, one step I am having issues with is the closing down of the Neoload controller instance. I can do this manually, but as there is a number of testers using the controller during the day, there has been a number of times when someone has not closed down the controller before leaving for the day. Therefore, when Jenkins runs the job, the test fails.
I have had a look around the web, but cant seem to find anywhere that details the steps needed to close the controller if open.
Can anyone help please.